Where:Blatnice pod Svatým Antonínkem | |
When:07/2018-06/2019 | |
What:2 indoor stainless pools, 1 outdoor stainless pool | |
Pool technology and stainless steel pools costs:12,8 million CZK without VAT | |
Total area of the pools:341,5 m2 | |
Total volume of the pools:387,75 m3 |
The unsatisfactory condition of the original summer swimming pool in the village of Blatnice pod Svatým Antonínkem decided to change the private investor, who increased the attractiveness of such a picturesque and popular tourist wine region in the foothills of the White Carpathians. The entire original complex has been completely renovated to meet current technical and hygienic requirements and at the same time to satisfy the demanding client. A new stainless steel multipurpose pool was inserted into the original concrete outdoor pool, which newly gives the swimming pool a modern and luxurious design. In the building of the original facilities and changing rooms, a wellness area with swimming pools and saunas was created. Newly, this operational building also includes a restaurant and accommodation in tastefully furnished rooms. In the area you will also find a multifunctional playground, wine cellar, apartments and a stage for cultural events.
The indoor stainless steel bath pool is mainly used for relaxation. It offers an air massage bench, bottom bead and water spout. The indoor stainless-steel whirlpool can be used by up to 4 people at the same time and through underwater air attractions they can relax their body in water at a temperature of 36°C. Each of these pools is designed with its own filtration circuit, with its own filtration, buffer tank, pumps, blowers and automatic dosing of chemicals. The pool technology is located directly under the pool tub.
The outdoor multipurpose pool is solved by one separate filtration circuit with a total filtration circulation rate of 200.0 m3 / hour. Clean and hygienically safe water is provided by bottom pipes that bring treated water to the pool, a buffer tank, circulating filter pumps, 3 sand filter containers with a diameter of 2000 mm and a height of a multilayer filter cartridge of 1000 mm, an automatic dosing device for chemicals with continuous water quality measurement. The pool is cleverly divided into three parts. The swimming part is designed for active individuals, it offers 3 lanes with a length of 25m. The relaxation part is separated from the swimming part by a rocking bay. In this zone, visitors can relax on massage air benches or have their back and neck massaged with a stainless-steel water spout and cannon. The last part of the pool is its children's zone with low water level, water urchin and stainless-steel slide in teddy bear design.
INOX SERVIS was responsible for the delivery and installation of the swimming pool technology, piping systems and stainless steel for this indoor pools and for this outdoor multi-purpose. The above services were rendered by INOX SERVIS for TUFÍR under a pertinent contract.